Fonterra Waitoa
Installation of Bio Mass Boiler and Related Systems



LOCATION:
Waitoa, Matamata-Piako
TYPE OF INDUSTRY:
Dairy
CUSTOMER:
Fonterra Waitoa
PROJECT SCOPE:
DKJ was responsible for the installation of a wood-burning Bio Mass Boiler, along with the associated conveyor systems, pipework, and valving. The project required precise installation to ensure the system's efficient operation.